Shot lists · Shot list
Restaurant and cafe space shot list for lease
Updated 10 Nov 2026 · by Venu Gopal Reddy Muvva, founder
For a restaurant or cafe space, photograph the frontage, the seating area, and then the expensive infrastructure a food operator would otherwise have to build: kitchen layout, exhaust hood and duct route, gas line or bank, drainage and grease trap, washrooms, power and water. F&B tenants judge an existing kitchen and exhaust as months of saved work and cost, so those close-ups matter as much as the dining room.
The shot list
Restaurant / cafe space shot list in shooting order.
| Shot | Angle | Lens / height | Why |
|---|---|---|---|
| Frontage and signage space | Across the road | 20–24 mm, 1.5 m | Visibility and branding |
| Street and footfall at meal time | Down the street | 24–35 mm | Lunch and dinner traffic |
| Dining area from the entrance | Doorway | 16–20 mm, 1.2 m | Covers and layout |
| Dining area back to the entrance | Far corner | 16–20 mm, 1.2 m | Glass front, light |
| Bar or counter | 45° | 20–24 mm, 1.2 m | Service flow |
| Kitchen wide | Doorway | 16–18 mm, 1.5 m | Line layout and space |
| Exhaust hood and duct route out of the building | Up at the hood, then outside | 20–24 mm | Exhaust is costly and needs permissions |
| Gas line, bank or meter | Straight on | 35 mm | Piped gas vs cylinders |
| Drainage and grease trap | Close | 35 mm | Required for food kitchens |
| Cold room or storage | Doorway | 20 mm | Stock and refrigeration |
| Dishwash area and water supply | Corner | 20 mm | Water and drainage |
| Washrooms (guest and staff) | Doorway | 16–20 mm | Count and condition |
| Electrical panel and load | Straight on | 35 mm | Kitchen equipment needs high load |
| Outdoor seating or terrace | Corner | 20 mm | Extra covers |
| Evening frontage lit | Tripod | 24 mm | Dinner-time look |
Order of shooting
- Shoot between services or on the closed day, after a deep clean of the kitchen.
- Dining area first with all lights on and tables set neatly (no food, no branding of the outgoing tenant if it's leaving).
- Kitchen and infrastructure with the landlord or chef present to point out the gas, exhaust and trap.
- Frontage in the morning, street at lunch, lit frontage after dark.
What F&B tenants look for
Restaurant operators shortlist on location and frontage, then do a ruthless infrastructure check: is there an exhaust route that neighbours and the building allow, is piped gas available, is there a grease trap and enough water and power, and how many covers fit. A space with a working kitchen line saves months, so photograph the hood, duct and gas clearly and caption them with sizes and load. Licences such as FSSAI registration belong to the operator, not the space, so don't imply they transfer.
Common mistakes
- A beautiful dining room and no kitchen photos; operators assume there's no kitchen.
- Hiding the exhaust route because it's ugly. It's the first thing they'll ask.
- Old tenant's branding and menu boards in every photo.
- Greasy, uncleaned kitchen shots that suggest expensive repairs.
Worked example: a 1,800 sq ft former cafe in Indiranagar
17 photos: frontage, 100 Feet Road at lunch, dining from both ends (48 covers), coffee counter, kitchen wide, hood and the duct running to the terrace, piped-gas meter, grease trap, cold room, dishwash, two guest washrooms and a staff toilet, the 3-phase panel (40 kW), terrace seating and the lit frontage. Captions carry the duct route and power load.
Editing and delivery
ListingPhotoStudio merges 3- or 5-shot brackets into one HDR photo with the window view pulled back, straightens verticals, corrects lens distortion and colour casts, and gives every photo a 0–100 QC score. Kitchens under mixed tube light and daylight benefit most from the colour-cast correction.
Make it a checklist
Turn this list into a printable checklist for your property's rooms and extras with the free shot list generator. It runs in your browser; nothing is sent to our server.
Questions
What photos do restaurant tenants want?
Frontage, seating, kitchen, exhaust hood and duct route, gas, grease trap, washrooms and the power panel.
Should I show the old restaurant's branding?
No. Cover or remove it, or shoot so it isn't the subject; tenants want to imagine their brand.
Do I need to photograph the exhaust duct?
Yes. An existing, approved exhaust route is one of the biggest value points of an F&B space.
We are not affiliated with any portal or MLS named here. Rules change: confirm on the linked official page before you rely on a number. General information, not legal advice.
ListingPhotoStudio edits listing photos (HDR, window pull, sky, straight verticals) and gives you MLS-sized, unbranded downloads with a quality score on every photo. Free for 14 days.
Related: Retail shop shot list for lease or sale · Commercial office shot list: floor plate, fit-out, services · Kitchen listing photos: angles, light and edits · White balance in mixed light: true wall and paint colours · All shot lists