Shot lists · Shot list

Under-construction project shot list: site progress and sample flat

Updated 10 Nov 2026 · by Venu Gopal Reddy Muvva, founder · rules checked 10 Nov 2026 on the official pages below

For an under-construction project, show what exists today: dated site progress photos of each tower, the sample (show) flat, the site office, the approach road and the location, and keep artist's impressions clearly labelled as such. In India, advertisements of registered projects must carry the RERA registration number (Section 11 of the RERA Act, 2016), and state regulators such as MahaRERA also ask for a QR code, so put those on the listing and the ad creative, not on every photo.

The shot list

Under-construction project shot list in shooting order (repeat the progress shots every month from the same spots).

ShotAngleLens / heightWhy
Site entrance with project boardStraight on24 mm, 1.5 mBoard shows name and registration details
Each tower from a fixed spotSame tripod mark every month24–35 mm, 1.5 mMonth-on-month progress comparison
Drone overview of the whole site60–100 m, 45°Drone wideTowers, roads, amenity area
Slab or floor progress close-upFrom a safe floor20–24 mmShows how far the structure is
Finishing work on a sample floorCorridor20 mm, 1.5 mTiling, plaster, lift shafts
Sample flat living roomEntry corner16–20 mm, 1 mWhat buyers will get
Sample flat kitchenCorner18–20 mm, 1.2 mFittings and platform
Sample flat bedrooms and bathroomDoor corner16–20 mm, 1.1 mSpecification check
Fittings close-ups (switches, CP fittings, flooring)Straight on35–50 mmBrands promised in the spec sheet
Clubhouse or amenity progressWide20–24 mmAmenities are part of the price
Approach road and nearest junctionLooking in24 mmAccess today, not in the brochure
View from an upper floorOut of a window opening24 mmWhat each tower will see
Site office / experience centreCorner20 mmWhere buyers visit
Labelled artist's impression (separate)As suppliedRenderFuture look, never mixed with photos

Order of shooting

  • Mark fixed camera spots for every tower on the first shoot (a paint mark or GPS pin) and reuse them every month.
  • Shoot progress early morning when work and dust are lowest; follow the site safety officer and wear PPE.
  • Do the sample flat on a separate visit, staged and lit like a finished home.
  • Name files with the date (2026-11-10-tower-B) so the progress log sorts itself.

What buyers of an under-construction flat look for

These buyers are paying years ahead, so they look for proof that work is moving and that the finished flat will match the sample. Dated progress photos, consistent angles and a sample flat that uses the same fittings as the specification sheet do more than a glossy render. NRI buyers and investors who can't visit rely almost entirely on the monthly progress photos.

Under the RERA Act, 2016, promoters must not advertise a project that should be registered without registering it, and must show the registration number in advertisements. Several state authorities (for example MahaRERA) also require a QR code linking to the project page. Check your state authority's current orders.

Common mistakes

  • Mixing renders with photos without a label; buyers feel misled at the visit.
  • Changing the angle every month, so progress can't be compared.
  • A sample flat with premium fittings that aren't in the spec sheet.
  • Ads and listings without the RERA number or QR code where the state requires them.

Worked example: two towers, 18 floors each, in Thane

Monthly set of 12: entrance with the project board, Tower A and Tower B from their fixed marks, a drone overview, a slab close-up from each tower, the clubhouse, the approach road and the view from the highest finished slab, each captioned "Site photo, 10 Nov 2026". A separate gallery holds the sample 2BHK (8 photos) and three renders captioned "Artist's impression". The RERA number and QR code sit on the listing page and every ad creative.

Editing and delivery

ListingPhotoStudio merges 3- or 5-shot brackets into one HDR photo with the window view pulled back, straightens verticals, corrects lens distortion and colour casts, and gives every photo a 0–100 QC score. Keep progress photos realistic: exposure and colour fixes only, no sky drama that hides a dusty site.

Make it a checklist

Turn this list into a printable checklist for your property's rooms and extras with the free shot list generator. It runs in your browser; nothing is sent to our server.

Questions

Do under-construction listings need the RERA number?

In India, ads of registered projects must carry the RERA registration number, and some states also require a QR code. Check your state authority's orders. Not legal advice.

Can I use 3D renders in the listing?

Yes, labelled as artist's impressions and kept separate from real photos.

How often should I update progress photos?

Monthly, from the same camera spots, with the date in the caption or file name.

Should the sample flat be photographed like a finished home?

Yes, but only with the fittings and finishes the buyer will actually get.

Sources

We are not affiliated with any portal or MLS named here. Rules change: confirm on the linked official page before you rely on a number. General information, not legal advice.

ListingPhotoStudio edits listing photos (HDR, window pull, sky, straight verticals) and gives you MLS-sized, unbranded downloads with a quality score on every photo. Free for 14 days.

Related: 3BHK apartment shot list: 24 photos for family buyers · Aerial and drone listing photos · Disclosing virtual staging and digitally altered listing photos · Photo requirements on Indian property portals: 99acres, MagicBricks, Housing.com, NoBroker · Plot and land shot list: what to photograph without a house · All shot lists